Zig Zag Towers

With the existing building maintenance systems inoperable, the Sky5 team was contracted to provide an access and cleaning solution due to the complex nature of the building design.

Zigzag Towers Doha, Qatar

August 1, 2014

August 19, 2014

3000

m

Lengths of Rope

18

days

To complete project

1440

Number of hours

Challenges
  • 140m vertical sections, spanning upwards with complex façade and intricate glazing panel design.
  • Our work teams had to scale up and down in size frequently.
  • Extreme environmental working conditions – heat, dust storms and swirling winds.
  • High-level and comprehensive equipment inventory requirements.
  • Actual condition of façade after years of degradation VS clients expectations.
  • Without previous work completed on the property by the company, rigorous Work Health and Safety procedures were required.
Solutions
  • Supply team size of 14 technicians – 2 Safety Co-ordinators – standby rescue and Rigging crews.
  • Hand held anemometer assessing weather conditions every hour to gauge weather conditions.
  • Specialised and custom access equipment supplied and installed to handle the access challenges of the project.
  • Two stage façade washing with initial and final clean proving the optimum option to meet client expectations.
  • Means and methods of maintenance rehearsed to ensure teams work in horizontal formation.
  • Working times commenced at sunset to avoid extreme climate conditions.

Delivering outcomes of the highest standard

“The Sky5 team delivered the project on time and within budget, taking just over 18 days to complete both towers external requirements. Client expectations were exceeded and the teams enjoying a well deserved break upon completion.”

Zig-Zag Towers or the 'Dancing Towers' due to their wave-like character, are the tallest and highest leaning twin towers in the world.

“Sky5 were engaged to certify height safety equipment at sites around Australia. They have been very flexible in accommodating each site’s requirements and have gone above and beyond to meet expectations. Their depth of knowledge and excellent level of workmanship ensured that all anchor point certification and installations were completed to the highest standard. Staff are professional, understanding and reliable and the overall service provided has been outstanding.”
Name of person
Position
Company Name
Share this...

Get all the latest Sky5 News

Subscribe
© 2018 Sky5 -
Site by KORE
Top
file-pdf-o linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram